Paul_Christie
New member
- Joined
- Mar 23, 2016
- Messages
- 153
- Reaction score
- 0
- Points
- 0
- Location
- Nottingham, UK
- Website
- www.instantpages.ltd.uk
- Excel Version(s)
- Office 365 Monthly update
I've got some text data that is being imported and mostly falling in to the correct data types. I've got an issue with three fields that are all Time fields. I've got a StartTime and an EndTime which are exactly what they say they are and I can easily setup another field called WorkingTime where I do EndTime-StartTime and get a correct answer. I've also got a field called BreakDuration that comes in as a Time field. When I set a custom field as EndTime-StartTime-BreakDuration I get an error. I've tried changing the BreakDuration field to a Duration type but I'm still getting an error.
I think I'm missing something obvious but I need someone to point me in the right die=restion with this please.
Paul
I think I'm missing something obvious but I need someone to point me in the right die=restion with this please.
Paul